To apply by our cutting edge technology and a lot of experiences.
Click the image to see the enlarged image.
(1) Dismantling operation for the refractories A
(2) Dismantling operation for the refractories B
(3) Situation that Y type anchor was welded A
(4) Situation that Y type anchor was welded B
(5) Completion to install Y type anchor
(6) Situation that the refractories were sprayed A
(7) Situation that the refractories were sprayed B
(8) Situation that the refractories were sprayed C
(9) Situation that executing the refractory (mold)
(10) Situation that bricks are piled up